Offloading and transportation of windmills
Cosmatos Group recently completed the offloading, transportation and receipt at storage area of 12 sets of windmills. The cargo arrived at Mesta port of Chios island aboard on vessel MV JSP PORTO.
Apart from the above services, Cosmatos Group arranged:
- HSE tutorial to stevedoring union prior to commencement of ops
- Daily Toolbox meetings with all personnel involved
- Marking of the perimeter of the operation’s zone with safety signals and access restriction by unauthorized personnel
- Use of Cosmatos Group own discharging equipment to assist maintaining high safety standards while avoiding cargo damage (lollipops)
Cosmatos Projects Team played an active role at all discharging operations to ensure that all steps were completed to the client’s full satisfaction.
Scope
- HSE stevedoring tutorial
- Daily toolbox meetings
- Safety signals and access restriction of perimeter of the operation’s zone
- Use of Cosmatos Group own discharging equipment
Cargo
- 12 sets of windmills with a total weight of 1656 mts