Wind Industry

Projects:


Bogdanci, FYROM
Scope:
From FOB Thessaloniki, offloaded at Port Storage Area, reloading on trucks, transport and offloading at Bogdanci FYROM site, including transit customs formalities.

Cargo:
16 WTG SWT-2.3-93 80MHH, arrived on 6 vessels

Sidirokastro Ext., Greece
Scope:
From FOB Thessaloniki Port, offloaded at Port Storage Area, reloading on trucks, transport to FOT Sidirokastro site.

Cargo:
5 x V902 3MV, arrived on 2 vessels

Ptoon & Maristi, Greece
Scope:
From FOB Stylis & Lavrio Ports, offloaded on Port Storage Area, reloading on trucks including formalities, disassembling of blade cages and cleaning of components.

Cargo:
Maristi Wind Farm: 21 WTG G87 T67M
Ptoon Wind Farm: 11 WTG G97 T78.5m, 9 WTG G87 T67M

Klokova, Greece
 

Scope:
From FOB Messologi Port, offloaded at Port Storage Area, reloading on trucks, transport to FOT KLOKOVA site.

Cargo:
2 x V902 3MV, arrived on 2 vessels

Koukos & Kapsala, Greece
Scope:
From FOB Stylis Port, offloaded at Port Storage Area, reloading on trucks, transport to FOT Koukos/Kapsala site.

Cargo:
10 x V902 3MV, arrived on 2 vessels

Windmill blades from Poland to Greece
Scope:
From Poland to South Greece, issuance of road permits, provision of suitable extendible trailers, efficient coordination between authorities of all countries, timely movement of the transport during snowy weather conditions

Cargo:
Windmill blades, L 44.2 x W 2.60 x H 2.81 mtrs, weight 10400 kgs each

Windmill generator from Germany to Greece
Scope:
From Aurich, Germany, to Marmari wind farm at Evia island in Greece, issuance of road permits, provision of suitable low bed trailer, efficient coordination between authorities of all countries, provision of pulling unit at the entrance of the site, timely movement of the transport.

Cargo:
Windmill generator, L 508 x W 420 x H 312 cm, weight 25300 kgs each

Offloading and transportation of windmills
 

Scope:
Offloading, transportation and receipt at storage area of windmills at Mesta port of Chios island.

Cargo:
12 sets of windmills aboard on vessel MV JSP PORTO

Windmills in Northern Greece
Scope:
Offloading, reception at port storage area, backloading and transportation to the site via Thessaloniki port. Daily toolbox meetings, preparation of cargo safety zones, use of own safety equipment to avoid damages to the cargo, dismantling of lugs & tower feet, cleaning of towers & blades and issuance of road permits.

Cargo:
4 sets of windmills with blades 65 meters long